- Scheduled Job sync when type was changed from scheduled to some other
type didn't work.
- It updates on every save with message, bad DX IMO (can't save script
and edit without dismissing)
- This was because of complex walrus which was triggering rest of code
even when nothing changed. Maybe walrus opponents were onto something.
- `Truthy` couples two different operations and hence makes code
complicated. In most cases where these checks are required it's not
performance critical, we can do 1 more function call to avoid this
coupling of change + actual value.